Central Institute for Mental Health

Image source: Pixabay

Plan check of the tender design

Location: Mannheim

Client: Vamed Health Project GmbH

Gross floor area: 25.000 m²

Total construction costs: -

Costs technical building services: -

Realisation period : 2017  

Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems

 

HOAI service phases: SP 6

Description: Plan check of the implementation planning LP5.