Construction clean room areas
Location: Leipzig Client: SIB NL Leipzig Gross floor area: 150 m² Total construction costs: - Costs technical building services: 1,0 million € Realisation period : 2005 |
Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems, CG 440 - HV current systems, CG 450 - Telecommunications and information technology systems, CG 470 - Usage-specific systems, CG 480 - Building and system automation |
HOAI service phases: SP 1 , SP 2 , SP 3 , SP 4 , SP 5 , SP 6 , SP 7
Description: In the biotechnical-biomedical center of the University of Leipzig, the clean room areas "chip production" and "tissue engineering" were built.