Ministry building and administrative building with conference rooms
Location: Berlin Client: Federal Office for Building and Regional Planning Gross floor area: 32.000 m² Total construction costs: 14,65 million € Costs technical building services: 5,1 million € Realisation period : 2012-2022 |
Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems, CG 434 - ???, CG 440 - HV current systems, CG 450 - Telecommunications and information technology systems, CG 460 - Conveyor systems, CG 470 - Usage-specific systems, CG 480 - Building and system automation |
HOAI service phases: SP 3 , SP 4 , SP 5 , SP 6 , SP 7 , SP 8 , SP 9
Description: Ministry building and administration building with conference rooms, archive and administration. To meet the fire protection required by building regulations for preventive and system fire protection in accordance with the new concept. The refurbishment work is being carried out during ongoing operations in a listed building.