Industrial construction
Location: Dresden Client: Elbe Flugzeugwerke GmbH Gross floor area: 13.100 m² Total construction costs: - Costs technical building services: - Realisation period : 2002 |
Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems, CG 440 - HV current systems, CG 450 - Telecommunications and information technology systems |
HOAI service phases: SP 1 , SP 2 , SP 3 , SP 4 , SP 5 , SP 6 , SP 7
Description: Extension of the existing hall 226.