Redevelopment of university complex with operating and training laboratory
Location: Darmstadt Client: KSP Engel und Zimmermann GmbH Gross floor area: 53.000 m² Total construction costs: 74,0 million € Costs technical building services: 34,0 million € Realisation period : 2009-2014 |
Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems, CG 434 - ???, CG 440 - HV current systems, CG 470 - Usage-specific systems, CG 480 - Building and system automation |
HOAI service phases: SP 5 , SP 6 , SP 7 , SP 8 , SP 9
Description: Reconstruction and refurbishment of the chemistry and materials/geosciences institute buildings at Darmstadt Technical University, as well as complete renewal of the building's technical systems.