New construction of distribution and logistics center
Location: Meißen Client: Sächsische Winzergenossenschaft Meißen e.G. Gross floor area: 640 m² Total construction costs: - Costs technical building services: 0,2 million € Realisation period : 2007-2008 |
Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems, CG 434 - ???, CG 440 - HV current systems, CG 450 - Telecommunications and information technology systems |
HOAI service phases: SP 3 , SP 6 , SP 7 , SP 8
Description: New construction of the distribution and logistics center of the Sächsische Winzergenossenschaft e.G. in Meißen.