University Hospital Carl Gustav Carus of the TU Dresden

Image source: Pixabay

Technical building services inventory and energy optimization

Location: Dresden

Client: Universitätsklinikum Carl Gustav Carus der TU Dresden

Gross floor area: 307.000 m²

Total construction costs: -

Costs technical building services: -

Realisation period : 2005-2009  

 

Description: Recording and evaluation of 90 existing buildings with a gross floor area of approx. 307,000 m² as well as approx. 5,200 technical installations and energetic actual analysis of the structural and technical condition of the buildings.