Energy saving concept and detailed analysis fire protection
Location: Berlin Client: Bundesamt für Bauwesen und Raumordnung (BBR) Gross floor area: 110.000 m² Total construction costs: 20,0 Mio. € (costs for energy and fire protection) Costs technical building services: - Realisation period : 2009-2011 |
Description: Development of a holistic energy saving concept including a detailed analysis of the structural and technical fire protection in the existing buildings for the properties of the Federal Institute for Materials Research and Testing (BAM).