New construction at the Geomatikum

Image source: HTP Hidde Timmermann Architekten GmbH

Technical and energy controlling

Location: Hamburg

Client: GMH Gebäudemanagement Hamburg GmbH

Gross floor area: 42.542 m²

Total construction costs: 177,0 Mio. €

Costs technical building services: 37,1 Mio. €

Realisation period : 2015-2019  

Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems, CG 434 - ???, CG 440 - HV current systems, CG 450 - Telecommunications and information technology systems, CG 460 - Conveyor systems, CG 470 - Usage-specific systems, CG 480 - Building and system automation

 

Description: Technical controlling and energy management/controlling for the new building at the Geomatikum in Hamburg.