Königshöfe - BIM methodology

Image source: decon D.E.-C. GmbH

New construction of the Königshöfe at Palaisplatz

Location: Dresden

Client: CG-Gruppe

Gross floor area: 33.000 m²

Total construction costs: -

Costs technical building services: -

Realisation period : 2017-2019  

Service: CG 410 - Wastewater, water and gas systems, CG 420 - Heat supply systems, CG 430 - Room air systems, CG 440 - HV current systems, CG 450 - Telecommunications and information technology systems, CG 460 - Conveyor systems

 

HOAI service phases: SP 3 , SP 4 , SP 5

Description: Planning of the TGA from LPH 3 - LPH 5 according to the BIM methodology for the system groups 1-6